KNX for architects starts with seven questions, put to the integrator while the drawing can still change: where the distribution board sits, how many bus lines there are and where each supply goes, where the touch panels and their power points are, where the ceiling speakers go, where the ventilation ducts run, who commissions and documents the system, and who services it after handover. This post takes them in order.
Why ask before the drawing is final?
A smart-home system is decided on paper long before the site. The items below each take space in a wall or a ceiling, and they are cheap to place on a drawing and expensive to move once the plaster is on. An integrator who answers them early saves the architect a revision later.
1. Where does the distribution board go, and how many channels does it need?
A KNX installation concentrates its actuators in a distribution board, with the switching outputs for lights, blinds and sockets. The board needs space, ventilation and access, and it is sized for the number of channels the design needs. Ask for the board's position on the plan and the channel count, with room to grow.
2. How many bus lines will there be, and where does each supply go?
A KNX line is a section of twisted-pair bus cable with its own power supply, at 30 V DC SELV. A line takes up to 64 devices with a 640 mA supply, with limits on cable length of 350 m from the supply to the furthest device and 1,000 m in total. A villa often needs more than one line. Ask for the line plan, and where each power supply sits.
3. Where do the touch panels go, and where do they get power?
A touch panel needs a wall box of the right depth and, in some models, an auxiliary supply in addition to the bus. As an example, the MDT Glass Touch Smart 4 and Smart Plus 4 need a 24 V DC auxiliary supply, are 92 x 92 x 12.5 mm and have an installation depth of 22 mm in the switch box. Ask for each panel's position, its box depth and its power point on the drawing.
4. Where do the ceiling speakers go?
In-ceiling speakers need a cut-out and depth above the ceiling, and the cable must reach each one. As an example, the Earthquake IQ8S in-ceiling speaker has a 240 mm cut-out and a depth of 121 mm, according to its manual. Ask who marks the cut-outs, and make sure the ceiling void is deep enough before the false ceiling is framed. Our Earthquake Sound page lists the in-wall and ceiling ranges.
5. Where do the ventilation ducts run?
Ducts need height and a straight run. A vertical heat-recovery unit such as the Blauberg Komfort EC SB 350 has duct collars on top, so the space above it matters as much as the unit. Ask who coordinates the ducts with the ceiling, the lights and the speakers, so that they are not drawn over each other.
6. Who commissions the system, and who documents it?
A certified integrator programs a KNX system in ETS. Ask who that is, and what the handover pack contains: the ETS project file, the list of addresses, the line plan and the cable types. A system is only finished when a stranger can understand it.
7. Who services it after handover?
Systems are used for years. Ask who answers the phone when something stops, in which city, and how quickly. If the integrator is tied to one brand, ask what happens if that brand changes. KNX is an open standard, so a different certified integrator can take over a well-documented project.
A one-page version
- Distribution board: position and channel count.
- Bus lines and supplies: the plan.
- Touch panels: position, box depth and power point.
- Ceiling speakers: cut-outs and depth.
- Ventilation ducts: route and coordination.
- Commissioning and documents: who, and what is handed over.
- Service after handover: who, where and how fast.
Send us the drawing and we will mark up where the cable runs and power points need to be.
Questions people ask
When should an architect involve a KNX integrator?
Before the drawing is final. The distribution board, the bus lines, the panel positions, the speaker cut-outs and the ducts all need space that is cheap to plan and costly to change later.
What does an architect need from the integrator at handover?
The ETS project file, the list of addresses, the plan of the bus lines and the cable types, plus the name of whoever services the system.
Can a different integrator take over a KNX project later?
KNX is an open standard, so a different certified integrator can take over, provided the project file and the documentation were handed over.
Drawing a home with KNX? Read our guide for architects and homeowners, or talk to our team.
Sources checked on 17 November 2026
- Morion Automation, KNX cable in India, for the bus line limits and the 30 V DC SELV bus.
- MDT Technologies, Glass Touch Smart 4 and Smart Plus 4 datasheets, for the 92 x 92 x 12.5 mm size, the 22 mm installation depth and the 24 V DC auxiliary supply.
- Morion Automation, Blauberg and Earthquake Sound, for the duct collars and the in-ceiling speaker range; the IQ8S cut-out and depth come from its product manual.
KNX for architects starts with seven questions, put to the integrator while the drawing can still change: where the distribution board sits, how many bus lines there are and where each supply goes, where the touch panels and their power points are, where the ceiling speakers go, where the ventilation ducts run, who commissions and documents the system, and who services it after handover. This post takes them in order.
Why ask before the drawing is final?
A smart-home system is decided on paper long before the site. The items below each take space in a wall or a ceiling, and they are cheap to place on a drawing and expensive to move once the plaster is on. An integrator who answers them early saves the architect a revision later.
1. Where does the distribution board go, and how many channels does it need?
A KNX installation concentrates its actuators in a distribution board, with the switching outputs for lights, blinds and sockets. The board needs space, ventilation and access, and it is sized for the number of channels the design needs. Ask for the board's position on the plan and the channel count, with room to grow.
2. How many bus lines will there be, and where does each supply go?
A KNX line is a section of twisted-pair bus cable with its own power supply, at 30 V DC SELV. A line takes up to 64 devices with a 640 mA supply, with limits on cable length of 350 m from the supply to the furthest device and 1,000 m in total. A villa often needs more than one line. Ask for the line plan, and where each power supply sits.
3. Where do the touch panels go, and where do they get power?
A touch panel needs a wall box of the right depth and, in some models, an auxiliary supply in addition to the bus. As an example, the MDT Glass Touch Smart 4 and Smart Plus 4 need a 24 V DC auxiliary supply, are 92 x 92 x 12.5 mm and have an installation depth of 22 mm in the switch box. Ask for each panel's position, its box depth and its power point on the drawing.
4. Where do the ceiling speakers go?
In-ceiling speakers need a cut-out and depth above the ceiling, and the cable must reach each one. As an example, the Earthquake IQ8S in-ceiling speaker has a 240 mm cut-out and a depth of 121 mm, according to its manual. Ask who marks the cut-outs, and make sure the ceiling void is deep enough before the false ceiling is framed. Our Earthquake Sound page lists the in-wall and ceiling ranges.
5. Where do the ventilation ducts run?
Ducts need height and a straight run. A vertical heat-recovery unit such as the Blauberg Komfort EC SB 350 has duct collars on top, so the space above it matters as much as the unit. Ask who coordinates the ducts with the ceiling, the lights and the speakers, so that they are not drawn over each other.
6. Who commissions the system, and who documents it?
A certified integrator programs a KNX system in ETS. Ask who that is, and what the handover pack contains: the ETS project file, the list of addresses, the line plan and the cable types. A system is only finished when a stranger can understand it.
7. Who services it after handover?
Systems are used for years. Ask who answers the phone when something stops, in which city, and how quickly. If the integrator is tied to one brand, ask what happens if that brand changes. KNX is an open standard, so a different certified integrator can take over a well-documented project.
A one-page version
- Distribution board: position and channel count.
- Bus lines and supplies: the plan.
- Touch panels: position, box depth and power point.
- Ceiling speakers: cut-outs and depth.
- Ventilation ducts: route and coordination.
- Commissioning and documents: who, and what is handed over.
- Service after handover: who, where and how fast.
Send us the drawing and we will mark up where the cable runs and power points need to be.
Questions people ask
When should an architect involve a KNX integrator?
Before the drawing is final. The distribution board, the bus lines, the panel positions, the speaker cut-outs and the ducts all need space that is cheap to plan and costly to change later.
What does an architect need from the integrator at handover?
The ETS project file, the list of addresses, the plan of the bus lines and the cable types, plus the name of whoever services the system.
Can a different integrator take over a KNX project later?
KNX is an open standard, so a different certified integrator can take over, provided the project file and the documentation were handed over.
Drawing a home with KNX? Read our guide for architects and homeowners, or talk to our team.
Sources checked on 17 November 2026
- Morion Automation, KNX cable in India, for the bus line limits and the 30 V DC SELV bus.
- MDT Technologies, Glass Touch Smart 4 and Smart Plus 4 datasheets, for the 92 x 92 x 12.5 mm size, the 22 mm installation depth and the 24 V DC auxiliary supply.
- Morion Automation, Blauberg and Earthquake Sound, for the duct collars and the in-ceiling speaker range; the IQ8S cut-out and depth come from its product manual.